Successful Test Run for Coal Gas Project of Xinjiang Yili Xingtian Coal Chemical


Posted on 2017-04-17 Author:LIYUCSF
 

The coal gas project of Xinjiang Yili Xintian Coal Chemical, constructed by Zhongtong Steel Structure completes the first test run successfully. This project covers an area of 2 million sqm with total investment of 13.5 billion Yuan. The usage of steel is about 30 thousand tons in total, all the steel fabrication and installation for all the utilities, low temperature methanol washing and methanation are constructed by Zhongtong Steel Structure.

 

The Project is the key project listed in <Thirteen five Plan of Coal Deep Processing Industry Demonstration >, aiming to realize the clean and efficient conversion of Xingjiang Coal resources, drive the local economic development and re-balance the coal and gas resources.


 

 

 

The coal gas project of Xinjiang Yili Xintian Coal Chemical, constructed by Zhongtong Steel Structure completes the first test run successfully. This project covers an area of 2 million sqm with total investment of 13.5 billion Yuan. The usage of steel is about 30 thousand tons in total, all the steel fabrication and installation for all the utilities, low temperature methanol washing and methanation are constructed by Zhongtong Steel Structure.

 

The Project is the key project listed in <Thirteen five Plan of Coal Deep Processing Industry Demonstration >, aiming to realize the clean and efficient conversion of Xingjiang Coal resources, drive the local economic development and re-balance the coal and gas resources.


 

 

网站建设 | 英文网站建设 | 最好的网站建设公司 | 高端网站建设 | 大型网站建设 | 定制网站 Web Design Company | Website Design Shanghai | Web Design China | B2B platform