ZURN North American Head Office Building in Chicago
It is located in Chicago, multi-storey steel structure, building area is 71,000 sqm, total steel consumed is 4,510t.
Zhonghua Street (section II) in Shijiazhuang City
Total investment of this project is 118 million RMB; the whole construction time is from Jan. 1, 2018 to June 15, 2018.
Hanging basket project in Indonesia
Front supporting point hanging basket, space truss structure.
National Fitness Activities Center Project
It is located in in Shijiazhuang City, steel structure design, building area - 30,816 sqm, building height - 23.95 m.
Gate Bridge for Chanba Ecological Garden
Its total length of full-spansteel box girder is 134.95 m.
North 2nd Ring Flyover Project in North Zhonghua Street
It is located in Shijiazhuang City, including two reinforced concrete structure superposed beams.
University of Phoenix
It is located in Arizona, United States of America.
Project of Shangdong Tongyu Company
120MW oil hydraulic forging and heat treatment department, total building area - 70,971 sqm.
Water-snow Project of Wanda Mao in Chengdu
The total steel consumption is about 17,000 tons; it will be finished before the 2019 Spring Festival; the total building area is about 360,000 sqm.
American Dream Project
The total construction area is 690,000 sqm (7.5 million sq ft), including retails, hotels and entertainment venue; the total steel consumption is about 1,180t.
Hebei Olympic Sports Center
118,530.2 sqm, Max lengthof canopy single-unit truss is 71m, widthis 2.8 m, weight is about 65 m.