Jinji Lake Bridges
Source: | Author:liyucsf | Published time: 2019-09-03 | 2180 Views | Share:


Jinji Lake project in Suzhou is 15.7 km in length, involving in Jinshuiwan Bridge, Zhongtanghe Bridge, Art Center Bridge and Fenghuangjing Bridge. In addition, the material of steel box girder and steel arch rib involved in this bridge project is Q345qD. The total tonnage of this project is about 3,200 tons.

 

Furthermore, the longitudinal slope of Jinshuiwan Bridge will adopt 2.2% with 2-way road, and the radius of vertical curve of the bridge is 1,200 m, while the longitudinal slope of Art Center Bridge is 3.0% with the 800 m radius of vertical curve. Additionally, the longitudinal slope of Zhongtanghe Bridge will adopt 1.5% with 2-way road, and the radius of vertical curve of the bridge is 800 m. The main bridge of Fenghuangjing Bridge is (30+45+60+45+30) m, while its approach bridge adopts continuous steel-box beam.