ZTSS Won Yangtze River Bridge Renovation Project


Posted on 2017-09-04 Author:LIYUCSF




Recently, Jiangsu Zhongtai Bridge Steel Structure (hereinafter referred as ZTSS) has successfully gotten the renovation project of Yangtze River Bridge in Nanjing City.




This grand bridge is used for both highway and railway, which is China’s first self-designed and constructed bridge that across Yangtze River. This bridge has four two-way lanes for highway and the total length of highway bridge is 4,588m (the railway bridge length is 6,772m). In addition, the main bridge (for highway & railway use) is 1,576m, which totally has 10 spans and consists of 4 joints. The layout of this bridge goes like (from north to south): 128m simply-supported steel truss girder; “3x160”m Type A simply-supported steel truss girder; “3x160”m Type A simply-supported steel truss girder; and “3x160”m Type B simply-supported steel truss girder.




Recently, Jiangsu Zhongtai Bridge Steel Structure (hereinafter referred as ZTSS) has successfully gotten the renovation project of Yangtze River Bridge in Nanjing City.




This grand bridge is used for both highway and railway, which is China’s first self-designed and constructed bridge that across Yangtze River. This bridge has four two-way lanes for highway and the total length of highway bridge is 4,588m (the railway bridge length is 6,772m). In addition, the main bridge (for highway & railway use) is 1,576m, which totally has 10 spans and consists of 4 joints. The layout of this bridge goes like (from north to south): 128m simply-supported steel truss girder; “3x160”m Type A simply-supported steel truss girder; “3x160”m Type A simply-supported steel truss girder; and “3x160”m Type B simply-supported steel truss girder.